1 00:00:40,069 --> 00:00:38,310 on the first night we received an 2 00:00:42,150 --> 00:00:40,079 individual challenge to design a tool 3 00:00:44,389 --> 00:00:42,160 with no moving parts that would allow an 4 00:00:46,150 --> 00:00:44,399 astronaut to repair the coolant system 5 00:00:48,229 --> 00:00:46,160 after coming together as a team and 6 00:00:50,790 --> 00:00:48,239 engineering the tool the design was 7 00:00:54,310 --> 00:00:50,800 programmed into a 3d drawing software 8 00:00:56,709 --> 00:00:54,320 and then printed using a 3d printer 9 00:00:58,790 --> 00:00:56,719 on tuesday morning we took the jsc tram 10 00:01:01,750 --> 00:00:58,800 tour to visit the space vehicle mock-up 11 00:01:03,910 --> 00:01:01,760 facility the dr christopher c craft jr 12 00:01:05,429 --> 00:01:03,920 mission control center and finally 13 00:01:09,270 --> 00:01:05,439 rocket park to get a glimpse of the 14 00:01:13,190 --> 00:01:11,190 on tuesday night all teams took part in 15 00:01:14,950 --> 00:01:13,200 apollo knight where we met milt heflin 16 00:01:16,870 --> 00:01:14,960 on the actual floor of historic mission 17 00:01:19,109 --> 00:01:16,880 control he told us about his many 18 00:01:20,950 --> 00:01:19,119 experiences with apollo missions and his 19 00:01:21,910 --> 00:01:20,960 flight director for the space shuttle 20 00:01:23,350 --> 00:01:21,920 program 21 00:01:25,350 --> 00:01:23,360 and then we were able to view the 22 00:01:45,830 --> 00:01:25,360 operational mission control room for the 23 00:01:48,950 --> 00:01:47,749 on wednesday morning fred smith came to 24 00:01:50,550 --> 00:01:48,960 talk to us about life support and 25 00:01:52,069 --> 00:01:50,560 habitability systems 26 00:01:53,670 --> 00:01:52,079 he spoke to us about many programs 27 00:01:56,230 --> 00:01:53,680 including mercury which worked out the 28 00:01:58,630 --> 00:01:56,240 basics of space flight and apollo during 29 00:02:12,309 --> 00:01:58,640 which nasa successfully took six manned 30 00:02:15,830 --> 00:02:13,830 before we could throw our lander off the 31 00:02:17,430 --> 00:02:15,840 third floor we had to loft our materials 32 00:02:19,589 --> 00:02:17,440 to the second floor to simulate us 33 00:02:22,229 --> 00:02:19,599 escaping earth's gravitational pull and 34 00:02:24,630 --> 00:02:22,239 entering lower earth orbit each team was 35 00:02:26,630 --> 00:02:24,640 given costs and rewards for each loft 36 00:02:28,550 --> 00:02:26,640 and at the end of the mission each team 37 00:02:39,509 --> 00:02:28,560 had to tally their costs to determine 38 00:02:39,519 --> 00:03:16,630 so 39 00:03:20,149 --> 00:03:18,390 for our final lunch and learn brandy 40 00:03:22,630 --> 00:03:20,159 dean spoke to all the teams about the 41 00:03:24,710 --> 00:03:22,640 orion program and its future plans such 42 00:03:27,110 --> 00:03:24,720 as its first launch in december to test 43 00:03:28,949 --> 00:03:27,120 the re-entry from a deep space mission 44 00:03:31,270 --> 00:03:28,959 with all the new technologies found on 45 00:03:49,910 --> 00:03:31,280 orion the goal of sending humans to mars